Project TypeProject NameDescriptionStatus
Public Works25.5 Wetlands RemediationThis project includes the design, construction, and inspection for the removal of exotic and invasive plant material and subsequent replanting of approximately 16 acres of previously constructed wetlands on the "25.5" acre City owned parcel. In Progress - Design
Utilities30" Water Main Replacement Along NW 44th St and N Pine Island RdReplacement of the 42ā€ diameter PCCP transmission main from the Springtree Water Treatment Plant to Pine Island Rd along NW 44th St, and the 30ā€ welded steel transmission piping along Pine Island Rd, from south of the Cā€13 canal to Oakland Park Blvd.In Progress - Construction
Leisure Services (GO Bond)9525 Parcel ImprovementsThis project will develop the existing vacant City parcel at the northeast corner of W Oakland Park Blvd and NW 95th Ter into a new park. Security improvements will be included and costs will be determined during design.Proposed Project
Leisure Services (GO Bond)Bair Middle School Joint Use ParkThis project will enhance existing facilities at Bair Middle School under a joint agreement with the School Board of Broward County and the City. Security improvements will be included and costs will be determined during design.Proposed Project
UtilitiesBotaniko New Home Development Gas SystemThis project is to serve a new 125 single family home sub-division to be constructed on the old West Course of the Bonaventure Country Club.In Progress - Design
Leisure Services (GO Bond)City Park ImprovementsThis project is a complete renovation of City Park, including a multipurpose field, stage, 3-covered basketball courts, playground, splash pad and restrooms. Tennis courts to be refurbished. Security improvements will be included. In Progress - Design
FacilitiesCity Post Office BuildingThis project would allow for the conversion of the old Village Post Office building to a public use facility. The work includes bringing the facility up to current building codes. The final use of the building is yet to be determined.Proposed Project
Leisure Services (GO Bond)Civic Center ExpansionThis project allows for the expansion of the existing Civic Center to provide space for enhanced and additional programming. Furthermore, the pool deck will be renovated and the pool resurfaced. Security improvements will be included and costs will bIn Progress - Construction
Public WorksCommercial Blvd Landscape and Irrigation ImpovementsThis project will enhance approximatley 1.5 miles of medians on W Commercial Boulevard from N Pine Island Road to the Sawgrass Expwy with new landscaping material and irrigation. Proposed Project
UtilitiesEast Sunrise Water Main ReplacementThis project replaces the older AC and cast iron portions, and interconnects in a section of East Sunrise with PVC systems, relocating all piping within the public right-of-way. (bounded by NW 19th Pl, NW 58th Ter, NW 63rd Ave, and Sunrise Blvd)In Progress - Construction
UtilitiesEscape and Valencia Water Main ReplacementThis project includes the replacement of water distribution mains in Davie. Replacement of the existing Sanitary Force Main was added to the project.Completed
Leisure ServicesFamily Aquatic Center ExpansionThis project allows for construction of a new family aquatic center the will include a water playground adjacent to the 50 meter pool. Amenities will include slides, a river ride, and concession facilities In Progress - Design
Leisure ServicesFlamingo Park RenovationThis project will renovate and add amenities to the existing park including security improvements.Completed
StormwaterHiatus Road Drainage RelocationPer the Interlocal Agreement between the City and Broward County, the City has entered into a JPA with the County to relocate City drainage facilities which are in conflict with the proposed privacy wall and the new roadway construction.In Progress - Construction
UtilitiesHiatus Road WallThis project will construct approximately one mile of new 10 foot high precast concrete privacy wall on the eastern side of the Hiatus Road Extension Project between Sunrise Boulevard and Oakland Park Boulevard.In Progress - Construction
1234